The project comprised of the extension of a grain silo storage facility and office block in Hemswell, Lincolnshire. 13 new silos were erected along with various buildings, an intake pit, dryer and all associated conveyors. There was also a new office block erected with state of the art equipment within its laboratory.
The project was split into two phases, phase 1 needing to be complete by the next harvest which meant the programme was very tight, this included:
Phase two included:
All works were being carried out on a live site, meaning liaising with the client was crucial.
Category:
INDUSTRIAL & FOOD PROCESSING
Area:
HEMSWELL
Location:
LINCOLNSHIRE
Client:
WOLDGRAIN STORAGE LTD
Architect:
CAD ASSOCIATES
Structural engineer:
BSP CONSULTING
M&E Consultant:
-
Form of contract:
JCT DESIGN AND BUILD 2011
Value:
£3,900,000
Project period:
41 Weeks