The project comprised of the strip out and renovation of a section of the existing school which was only being used for storage and was suffering from extensive water penetration via the roof and windows.
3 large classrooms, a new reception / entrance, new toilet suite and an office were formed within this previously under utilised area setting new standards of facilities for the school.
The works generally consisted of the following elements:
Category:
EDUCATION
Area:
HIGH GREEN, SHEFFIELD
Location:
SOUTH YORKSHIRE
Client:
PACES SHEFFIELD
Architect:
CYNERGI LTD
Structural engineer:
-
M&E Consultant:
-
Form of contract:
JCT 2005 DESIGN & BUILD CONTRACT REV 2 2009
Value:
£265,360
Project period:
10 WEEKS