This development involved the construction of 10 3-storey detached houses in the Nottinghamshire town of Stapleford.

Initial phases of the project involved the separation of the site with the neighbouring Aldi site with the construction of gabion basket walls, together with party wall agreements with the neighbouring properties.

The groundworks package was undertaken to create the necessary formation levels, after which the foundation dig and pour took place. Simultaneously the foul and surface water drainage connections were also managed in conjunction with their planning conditions.

Following the installation of the damp proof course and the construction of the block and beam flooring, the respective timber frames were erected to all plots.

The external facing brickwork and blockwork to each of the plots using Chesterton Alderley Burgundy facing bricks.

Internally the fit out was completed by Jessops Construction including the high specification finishing schedule.

As an NHBC scheme, key stages during the build, namely foundations, Superstructure First Fix (pre-plaster) and pre handover are observed by an independent NHBC inspector.

The project was completed on time and on budget with 9 properties having been sold within 3 months of completion.

 

More Residential Projects »

Residential Development, Stapleford, Jessops Construction Ltd
Residential Development, Stapleford, Jessops Construction Ltd
Residential Development, Stapleford, Jessops Construction Ltd
Residential Development, Stapleford, Jessops Construction Ltd
Residential Development, Stapleford, Jessops Construction Ltd
Residential Development, Stapleford, Jessops Construction Ltd
Back to top

Category:
RESIDENTIAL

 

Area:
Nottinghamshire

 

Location:
Nottingham Road, Stapleford

 

Client:
JCL

 

Architect:
The Harris Partnership

 

Structural engineer:
BSP Consulting Ltd

 

Form of contract:
Bespoke Contract with Aldi

 

Value:
2.5 Million

 

Project period:
44 Weeks