Tel: 01636 681 501
Click to email

Projects
Residential
Sheaf Apartments, Sheffield

Sheaf Apartments consisted of 52 New Build dwellings built in 3 blocks consisting of: Block 1: 12 apartments; Block 2: 32 Apartments and Block 3: 8 apartments each consisting of 2 and 3 bedrooms. Block 1 also contained the leisure area for all dwellings which consisted of the following:

 

  • Swimming Pool
  • Spa
  • Sauna
  • Fully equipped changing facilities i.e. showers, toilets, lockers, seating etc.
  • Fitness Suite (incorporating a disabled lift)
  • Reception area

 

... all of which were furnished to a very high standard.

 

Blocks 1 and 2 were constructed using a steel frame, reconstituted stone and block inner skin with PC planks forming the structural floors topped with acoustic screed.

 

Block 3 was of a traditional build i.e. Natural Stone, block and PC planks.

 

Internal walls and ceilings were constructed using metal stud system and blockwork, all finished using the dry lining method.

 

Leaderflush door sets were installed on all dwellings finished in beech veneer with satin stainless steel furniture.

 

Every apartment has a fully integrated state of the art kitchen, appliances include stainless steel ovens and Smeg hobs, extract hoods plus fridge freezer and dishwasher. Kitchen units were installed from the Arnold Laver Studio range.

 

Tarkett Viva 3 strip plank 8.5mm hardwood flooring in maple was installed to the majority of floors.Bathrooms were finished with good quality glazed tiles with modern white sanitary ware suites including modern chrome showers.

 

Block 2 had two personnel lifts installed allowing easy access to all floors including the penthouse areas which also had private balconies with spectacular views.

 

Some apartments had duplex areas constructed together with opening roof lights, all roofs were finished with slate and coping stones capping gable end walls.

 

Aluminium windows were installed abutting stone cills and mullions.

 

Heating was provided in each apartment by using the combi-boiler wet system. The courtyard includes private parking spaces, hard and soft landscaping. All apartments are fitted with a video/audio door entry system and all ground floor apartments fitted with an intruder alarm system.

 

More Residential Projects »

Sheaf Apartments, Sheffield , Jessops Construction Ltd
Sheaf Apartments, Sheffield , Jessops Construction Ltd
Sheaf Apartments, Sheffield , Jessops Construction Ltd
Back to top

Category:
RESIDENTIAL

 

Area:
SHEFFIELD

 

Location:
SOUTH YORKSHIRE

 

Client:
GLEESON REGENERATION

 

Architect:
CHURCH LUKAS

 

Structural engineer:
EASTWOOD AND PARTNERS

 

Form of contract:
JCT 98 WCD

 

Value:
£3,830,000

 

Project period:
52 WEEKS

Brochure download
©2024 Jessops Construction Ltd.
Terms  |  Privacy  |  Cookie Use